A corrugated metal roof is quieter than pvc when it rains.
How do u install metal roofing.
Take your first sheet.
This is what it looks like when you install a steel shingle roof system over an existing asphalt shingle roof.
You will need to order enough metal material to cover the entire roof and this process.
Add the metal panels.
Always begin working at the point with the longest peak to eave distance.
Measure the roof area.
You ll want to order metal panels that are an appropriate color and look to complement your.
Venting the eaves to vent the roof holes are cut in the old roof above the soffit which pulls air through the soffit vents underneath.
Metal roofing can also be significantly more expensive.
Place the first screw.
Metal roofing resists rot is not susceptible to insect damage and is non combustible a boon in fire prone areas.
The edging or eave flashing consists of metal strips that are used to cover the perimeter of.
Hidden fastener installation step 1.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
To watch the entire series from the beginning click here.
Bend panel edge we will prepare the end of this panel by cutting up one inch on either side folding under and.
One downside is that the metal sheets have a susceptibility to denting both in installation and during hailstorms.
Installing your roofing 1.