Place the first screw.
How do you apply metal roofing.
Make sure that the screws are all aligned evenly as you will be able to see them from the ground if they are.
Use your neoprene washer head screws to secure the metal to the sheathing.
Wear hearing and eye protection.
The panels overlap allowing water to flow from one panel to the next without being able to penetrate the area under the roofing panel.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Remove the old roof.
Some panels have pre drilled holes.
You will need to order enough metal material to cover the entire roof and this process.
In a standing seam roof long single panels run vertically all the way from the eave to the ridge.
Space the screws about 12 in 30 cm apart.
The screws that you will be using will have a rubber washer with a metal cap.
Measure the roof area.
Allow for a minimum of 18 inches 46 cm if you need to lap to complete the run.
Angle grinder 1 x research source the fastest option.
Paint or prime cut edges to prevent rust.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
When you tighten the screw it s critical that you don t drive it too far.
You ll want to order metal panels that are an appropriate color and look to complement your.
Most panels come up to 32 feet 9 8 m in length.
Install the roofing screws vertically along each rib in the panel.
If you want to install steel over asphalt your best choice for installing metal roofing is to use a steel shingle system like the one shown instead of the more common and more expensive standing seam steel.
You want to tighten the washer so that it spreads to the edge of the metal cap and not past the metal cap.
Install metal flashing along the edge of the roof using a hammer and 1 2 inch roofing nails.
Circular saw 2 x research source slower than angle grinder but follow same step 2 pre drill holes on the ridges.
Measure the length of the roof edge with a tape measure.
Step 1 cut the panels to the desired length.
For exposed fasteners avoid over tightening the fastener.
Install gutters in valleys as needed.
As a first line of defense against water damage it is important that the metal roof overlap be implemented correctly.
Use metal snips to cut flashing material.