While diyers usually work with 8 ft long panels the pro method usually is to use 10 or 12 ft long drywall panels which sometimes will cover the entire length of smaller rooms.
How long to hang a sheet of drywall.
Half inch is the preferred thickness for walls and ceilings.
Measure from the end of the ceiling to the middle of a joist and cut the sheet to length.
Shorter for easier fitting.
It will even tell you what drywall scraps will be left over.
One day to four weeks.
Factors that affect the drywall installation time.
Small job should add 1 to 2 hours for hanging and taping each.
1 4 inch is the choice for curved walls and arches.
The sheets most commonly available in hardware stores measure 4 by 8 feet but lengths can reach up to 16 feet and widths up to 54 inches which speeds the installation and minimizes the number of seams.
5 8 inch is heaviest and the most soundproof.
If you re hanging your sheets horizontally measure 48 down from the ceiling and place a mark on two studs.
However right now i can tell you a broad estimate for any drywall installation.
If you hang the drywall perpendicular to the studs you ll end up using about 5 screws in each stud.
It lays out sheets one at a time to come up with a sheet count estimate.
This means working with the largest drywall panels and pieces you can handle safely.
If the walls studs fall 16 inches on center a 12 foot long sheet will cover approximately 10 studs.
Gaps at ends and splices should be less than 1 4 in.
You re essentially making a ledge on which to rest a large piece of wallboard.
So that total comes to about.
3 8 inch is best to cover existing walls.
It assumes all studs are 16 inch on center and staggers the upper and lower sheets as would be done the real world.
End cuts should split framing members.
Insert one drywall screw deep enough into each stud to hold your piece of wallboard.
5 8 inch works best if studs or joists are 24 inches apart where thinner drywall would sag.
This means that for a 4 x 12 sheet of drywall you will probably use around 50 screws on the entire sheet.
Keep in mind that some of them you can control and some you cannot.
1 hr to stock 1 hr to clean up and 1 hr for dump.
Add in material costs dump fees and 5 profit and 10 overhead.
Professional drywall hanging crews generally consist of two workers.
From end of sheet with a drywall square.
Cut overall lengths 1 4 in.
When hanging drywall the ultimate goal is to create the fewest number of seams possible.