Space each nail apart by about 30 to 36 inches 76 to 91 cm along the side of the felt closest to the roof s peak and 12 inch 30 5 cm along the side closest to the ground.
How many shingles do i need for my shed roof.
Small sheds usually require about 100 to 150 clout nails.
Nail the new shingle in using roofing nails.
So most popular shingles are sold such that three bundles are needed to cover one square of roof area.
Start at one of the upper corners of the felt and continue along the perimeter.
Nail the shingle in place with four nails so the shingle overlaps the drip cap on the end and bottom of the roof by 1 2 to 3 4 inch.
For regular three tab shingles this would require 320 nails per square for field shingles.
The average 3 tab shingle needs four nails per shingle.
Multiply the number of starter shingles required by 5 to determine the number of nails required to fasten starter course.
As you lay subsequent rows of shingles stagger their placement so that seams do not line up and.
At 4 nails per field shingle that s about 320 nails per square.
Start in one bottom corner.
When you are using 3 bundles for a square you will be getting 29 standard shingles in each bundle.
It is common to use 3 bundles to a square of shingles.
You will also need 5 nails for each starter shingle.
This insures proper seal at the roof edges.
However if you are using heavier shingles you will require 4 to 5 bundles for a square.
Estimate how many roofing nails you ll need.
Be careful to drive nails flush.
For a new roof you will also need the same amount of underlayment.
Shingle calculator for your shed continued the perimeter of the roof needs to have a shingle nailed in place with the tabs facing inward.
The building codes in your area your shingle may need 4 6 nails for each section of shingle.
Roof rise times 4 edges 72 in.
How many nails will you need nails will also be required for any roofing project.
Measure up the width of a full shingle from the drip edge and make a mark at each end of the roof.
For high wind areas use 6 nails per shingle or 480 nails per square.
320 nails will be needed to install a square of standard 3 tab shingles assuming four nails per shingle and 80 shingles per square.
X 2 192 in.
Continue nailing cut shingles along the bottom row to create a solid strip of shingles at the bottom of the roof.
From our calculations above we have.
Generally you should use four nails per shingle in the field of the roof and 5 nails per starter shingle.
The result is 240 and this means you would need 240 squares of shingles to cover that roof.
X 4 288 in.
The most common type of shingle called a three tab or strip shingle is generally packaged three bundles per square.
Length of the roof front to back time 2 edges 96 in.